- MSD Landing Pages
- Permit Scheduling
Permit/Inspection Scheduling
Canton’s Building and Inspection Services now offers Online inspection Scheduling, available 24/7.
100 - Site /Area barricaded prior to construction/demolition
101 - Open hole inspection, demolition
102 - Footing inspection before concrete
103 - Basement backfill and drainage
105 - Garage floor before concrete
106 - Porch floor before concrete
107 - Concrete floor before concrete
108 - Concrete forms/flatwork before concrete
110 - Rough framing inspection/concealed fire stopping
111 - Rough fireplace-building
112 - Insulation inspection
114 - Fire rated wall/fire stopping inspection
116 - Masonry base flashing / moisture barrier inspection
117 - Commercial re-occupancy – Initial Inspection
118 - Building open ceiling
119 - Temporary final C of O (Building)
120 - Final Inspection/C of O (Building) * Also final inspection for pools, sheds, re-placement windows/doors, decks, porches, structures, re-occupancies and demolitions
130 - Vacant property/secure building (PSD)
210 - Concrete flatwork final *driveways, sidewalks, shed floors & patios (separate permits)
220 - Roof final
430 - Sign final
640 - Fence final
310 - Initial inspection SFH/condo/duplex for each cycle
320 - Re-inspection after initial inspection *SFH/condo/duplex
401 - Electrical service release
403 - Electrical underground
405 - Pool grounding inspection
407 - Electrical rough inspection
409 - Fire alarm rough
410 - Electrical open ceiling
415 - Re-connect inspection for furnace, AC and signs
419 - Temporary final electrical for stocking
420 - Final electrical
501 - HVAC rough inspection *for new Furnaces, Air Conditioners, Fireplaces, Ductwork & Process Piping
503 - Fire suppression rough
505 - Hot water tank replacement inspection
507 - Gas line inspection
509 - Medical Gases inspection
510 - HVAC open ceiling
515 - Hood acceptance/final inspection *for kitchen hoods
520 - Final HVAC *for new furnaces, air conditioners, fireplaces & ductwork
601 - Water & sewer service
602 - Storm line inspection
603 - Sewer cap inspection
605 - Plumbing underground
610 - Plumbing rough inspection
615 - Hot water tank replacement inspection
616 - Medical gases inspection
619 - Backflow inspection
620 - Final plumbing
630 - FOG compliance inspection
719 - Temporary final, landscaping w/bond
720 - Final landscaping
805 - Parking lot, before asphalt base/concrete inspection
810 - Parking lot final inspection
819 - Temp Final Engineering
820 - Engineering Final
901 - Fire Suppression Rough
903 - Fire Suppression Final
906 - Fire Alarm Final
907 - Hood acceptance/Ansul/Final inspection
911 - Special event approval/prior to event (Fire Works – Tents)
919 - Temporary Final Fire Marshal/Inspector (Building)
920 - Final Fire Marshal/Inspector (Building)
-
Joseph Urbanek
Building & Inspection Services Manager
-
Building & Inspection Services
Physical Address
1150 S. Canton Center Road
Canton, MI 48188
Phone: 734/394-5200
Cityview Portal
Check building permit status and pay fees here
Office Hours
Monday through Friday
8:30 a.m. to 4:30 p.m.
Employee Directory
Directory